Quelques updates du chantier sur le blog de CP :
https://www.cedarpoint.com/blog/september-construction-update
Avec de belles photos :
This is an inside-the-structure look at the overbanked turn just after the 4th inversion on the return back to the station, just before the last bunny hills.
And if you look the other way, here's the exit out of the structure into the bunny hills:
This is the third inversion coming out of the section that goes inside the structure near the station:
Finally, a previously-unseen portion of the ride, the final brake run. If you remember, in the past, the brake run came down at an angle, and now, after the bunny hills, it goes up into this straight-ish section of track.
The photo is taken from the station looking back, and if you look realllllly closely, you'll be able to see the train make its final "airtime run" as it approaches the brakes.